GARY TODD II
510-600-1230
firelion19@yahoo.com
175 Indian Lake
Dr.,West Lebanon,
Maine, 04027
The continuation of learning and experience, while achieving goals
together with an exceptional company.
!
!
!
Experience
Lead GIS Technician, Avineon Inc, St.Petersburg, Fl- 2006-2014
The use of AutoCAD, ArcMap, ArcCatalog, G-Tech,to convert as-builts, operational
changes, and Reports into GIS for multiple utility companies throughout the United
States.
Projects
PG&E's Gas Distribution system (Pacific Gas & Electric)-Converted PG&E's
current mapping system into GIS I also developed new functions and processes for
Cathodic Protection and Emergency Zones. Using ArcCatalog I was able to create
the stored displays for Emergency Zones and Cathodic Protection
SEMPRA's Gas Distribution System- Converted SEMPRA's old paper mapping
system into GIS. Through the course of the project I ended up becoming the Quality
Control Analyst. The project lasted five years.
Charlotte/Mecklenburg Water and Sewer- Used source data, such as as-built
drawings, working drawings, elevation plans and converted these plans using
ArcMap and ArcCatalog to convert Charlotte/Mecklenburg Water and Sewer system
into a geographically accurate database.
Richmond Sewer- Converted Sewer as-built and elevation drawings into GIS using
ArcMap. This included Arch Sewers, Storm Sewers, and Combined Sewer systems.
Northwest Energy- Quality Control drawings using AutoCAD 2012. I made sure
that gas and electric facility was snapped and in the correct locations. Also
performed completeness checks to make sure all facility was captured on the maps.
United States Census Bureau TIGER MTAIP Project-Realigning road
centerlines to updated sources that were prepared by another team using satellite
imagery.
!! !
!
!
Education
Spaulding High School-Diploma-2002
!
Skills
AutoCAD- Adept
ArcMap, ArcCatalog- Expert
Microsoft Excel, Outlook, Word- Expert
Reading As-builts, Construction Drawings, Operational Diagrams and Maps- Expert
!
References
Angela Reising: 727-421-0819, Supervisor of Quality and Testing, PG&E
Don Vanker: 727-505-4824, Project Manager, Avineon
Drafter, Tesinc LLC, Tampa, Florida — 2005-2006
Project
Verizon FTTP project-Posting fiber optic job orders from construction to Verizon's
proprietary database using MicroStation J. Job orders also were posted with the
standards and requirements of the state that the job order came from.